Inspection in Industrial Manufacturing Projects
Engineering
June 30, 2025 5 min read

Inspection in Industrial Manufacturing Projects

Manufacturing process inspection is a systematic approach to ensure the quality, compliance, and safety of products and equipment throughout production. It covers all phases from raw material verification to production monitoring and final testing.

Quality Control and Quality Assurance: Differences and Importance in Industrial Projects
Certification
June 27, 2025 5 min read

Quality Control and Quality Assurance: Differences and Importance in Industrial Projects

Quality control and quality assurance are two complementary and critical processes in industrial projects.

What is Pre-Shipment Inspection (PSI) and Why is it Important?
Engineering
June 26, 2025 5 min read

What is Pre-Shipment Inspection (PSI) and Why is it Important?

Pre-Shipment Inspection (PSI) ensures that products are independently inspected before shipment for quality, quantity, packaging, and technical compliance.

What Is Third-Party Inspection? How Does It Add Value to Your Project?
Engineering
June 25, 2025 5 min read

What Is Third-Party Inspection? How Does It Add Value to Your Project?

Third-party inspection is an independent auditing process based on the principle of impartiality. It is carried out by expert firms that have no direct affiliation with either the manufacturer or the client. This service ensures quality assurance, checks compliance with international standards, and identifies potential nonconformities early to reduce costs.

How Does the Quality Control Process Work in Industrial Projects?
Engineering
June 24, 2025 5 min read

How Does the Quality Control Process Work in Industrial Projects?

The foundation of success in industrial projects lies not only in accurate engineering calculations but also in proper applications and continuous quality control.

What Is a FAT Test and Why Is It Necessary?
Engineering
June 23, 2025 5 min read

What Is a FAT Test and Why Is It Necessary?

In order for industrial projects to be completed successfully, it is not enough to simply deliver products the delivered equipment must also meet specifications and operate correctly. This is where the FAT Test, or Factory Acceptance Test, comes in.